Showing posts with label lean. Show all posts
Showing posts with label lean. Show all posts

Saturday, July 10, 2010

Excuses for not implementing 5S

Implementing 5S is a change point and people with organizations are afraid of change. The top 10 excuses for not implementing 5S are :

1. I don't have the time.
2. I can't get the funding.
3. My boss will never go for it.
4. Were not in the kind of business likely to innovate.
5. We won't be able to get it past legal.
6. I've got too much on my plate.
7. I'll be punished if I fail.
8. I'm just not not the creative type.
9. I'm already juggling way too many projects.
10. I'm too new around here.

So, how as a lean leader do you get beyond these excuses?

1.) First and foremost, turn each excuse into a question. Begin with "How can I" or "How can we" (For example - if 5S is a priority, how can I or we create time for implementing 5S.
2.) Brainstorm with your team. (Need to create a mindset of how we can do vs why I cannot do)
3.) Take action immediately, don't worry if the plan is not 100% complete. They say the best kaizen is an implemented kaizen.

As a leader of the organization, it's your job to create a kaizen mindset or let's try mindset. Ofcourse in order to promote this type of mindset, the systems must be in place so people are not penalized for failures but are recognized for trying something new and learning from it.


To learn how to implement 5S click here - http://www.defa.me/u/1756

Tuesday, April 27, 2010

What is 5S

5S is a management acronym that uses a list of five Japanese words which are Seiri, Seiton, Seiso, Seiketsu and Shitskuke. 5S has gained fame in manufacuturing or for that matter in healthcare under the umbrela of lean manufacurturing or "Toyota Production System". The 5S looses translates into english as follows:



Phase 1 - Sorting: Go through all tools, materials, etc., in the plant and work area. Keep only essential items. Everything else is stored (for later use) or discarded.



Phase 2 - Straightening or Setting in Order: Basically there should be a place for everything and everything should be in its place. The place for each item should be clearly labeled. Items should be arranged in a manner that promotes efficient work flow. Each tool, part, supply, piece of equipment, etc. should be kept close to where it will be used (i.e. straighten the flow path). Seiton is one of the features that distinguishes 5S from "standardized cleanup".


Phase 3 - Sweeping or Shining or Cleanliness (Systematic Cleaning): Keep the workplace clean as well as neat. At the end of each shift, clean the work area and be sure everything is restored to its place. This makes it easy to know what goes where and ensures that everything is where it belongs. A key point is that maintaining cleanliness should be part of the daily work - not an occasional activity initiated when things get too messy.


Phase 4 - Standardizing: Work practices should be consistent and standardized. Everyone should know exactly what his or her responsibilities are for adhering to the first 3 S's.


Phase 5 - Sustaining the discipline: Maintain and review standards. Once the previous 4 S's have been established, they become the new way to operate. Maintain focus on this new way and do not allow a gradual decline back to the old ways. While thinking about the new way, also be thinking about yet better ways. When an issue arises such as a suggested improvement, a new way of working, a new tool or a new output requirement, review the first 4 S's and make changes as appropriate.



Recently the industry has also added the 6th S for safety. If you would like additional information on this subject, visit
http://tinyurl.com/24k9mat

Lean Manufacturing